RESUME
Name:
Ammar Ghandour
Proposed Position:
Sr. drilling & work over supervisor
Date of Birth:
01/07/1973
Gender:
Male
Marital Status:
Married
Nationality
Syrian
E-mail:
Mobile :
00905318355277
Education Background
Period
Education description
2003 - 2005
Round II well Engineering DLP(Distance Learning Package) / Shell center.
2000 – 2003
Round I well Engineering DLP(Distance Learning Package) / shell center .
1991 – 1996
Degree in Petroleum Engineering, University of Homs
Training
Period
Training description
Field Training
Theoretical Training
Certificates
YEAR
COURSE NAME
LOCATION
COMPANY
Jun .2004
Volumetric Stripping Course.
Netherlands
Simwell-NAM-Shell
sep.2004
Stuck Pipe prevention.
Cairo- EgyptEDC training centre
Jun.2004
IWCF (valide until 2006)
Netherland
NETHERLAND
Jun 2003
P130, Basic well Engineering Course & Round I Examination.
Netherlands
Shell training centre
Sep-2001
FIRE FIGHTINGAFPC –TRANING CENTER
SHELL-SYRIA
May -2005
Round II preparation and Examination.
Netherlands
Shell training centre
Ot- 2001
Induction to environment protection in AFPC
AFPC –TRAINING CENTER
SHELL-SYRIA
Sep.2001
Norm for supervisorAfpc- training center
Shell –Syria
Aug.2005
Well plan and Compass for Windows Applications.
AFPC-Syria.Shell-syria
Aug.2003
The roleof the supervisorsin safety at worksite
AFPC-Syria.Shell-syria
Dec.2004
Attitudes and behaviors for supervisors
AFPC-Syria.Shell-syria
Jun.2004
Well control course .
NETHERLAND
NETHHERLAND
Dec.2002
Permit to work system
AFPC –TRANING CENTER
Shell-syria
Dec.2001
Safe handling of chemicals
AFPC –TRANING CENTER
Shell-syria
Ot..2001
Hydrogen sulphide (H2S) &breathing apparatus
AFPC –TRANING CENTER
Shell-syria
Ot.2001
Authorized gas tester
AFPC –TRANING CENTER
Shell-syria
Aug.2002
Emergency response
AFPC –TRANING CENTER
Shell-syria
Mar. 2004
Norm tester
AFPC –TRANING CENTER
Shell-syria
Dec.2001
First aid
AFPC –TRANING CENTER
Shell-syria
JUN.1999
Foam and AIR Drilling Technology
SPC
IHRDC
Jan.2003
Bit Runner Course For Running Pdc Bit,Impregnated Bit,Natural Diamond Bit
hycalog
Syria
Jul -2006
Stuck Pipe prevention.
Cairo- EgyptEDC training centre
2006-2007-2008-2010-2011-2012-2013-2014-2015
Hydrogen sulphide (H2S) &breathing apparatus
UAE
ADCO/ESTSDC/
Alghiath
Dec-2011
Basic frist aid
UAE/NDC
BUREAU VERITAS
Dec-2011
Rigging and Slinging
UAE/NDC
BUREAU VERITAS
June-2012
STUCK PIPE AND HOLE CLEANING
SCHLUMBERGER
UAE/ADCO
May-2012
WELL PLAN
HALLIBURTON
UAE/ADCO
May-2012
OPEN WELL
HALLIBURTON
UAE/ADCO
May-2012
EDM SYS ADMIN
HALLIBURTON
UAE/ADCO
May-2012
COMPASS
HALLIBURTON
UAE/ADCO
Apr-2012
Advanced Safety Leader ship
Cardenwell training LTD
UAE/ADCO
June2006
IWCF (valide until 2008)
Cairo- EgyptEDC training centre
Jan-2009
IWCF (valide until 2011)
IPC/ ADCO
UAE/ADCO
Feb-2011
IWCF (valide until 2013)
ADCO/GTSC
UAE/ADCO
Oct-2012
IADC Well Cap (valide until 2014)
GTSC/ADCO
UAE/ADCO
Apr-2015
IWCF (valide until 2017)
ADCO/
249GTSC
UAE
Aug-2015
Advanced Incident Investigation& Root Cause Analysis
ADCO
UAE
Nov.2015
Extended Reach Drilling (ERD) & Stuck Pipe Prevention (SPP)
K&M
ADCO
Work Experience
Period
Work Description
Dec.1996-, July 2006 SPC(1996-2000)
AFPC(2000-2006)
Employer Company: SPC , AFPC
Client Company: Shell& SPC
Work Locations: Syria
Positions: Drilling & Work over Supervisor
Work description:(A)
Drilling: 6 years experience
Completing rig move, drilling 26 “top hole, running and cementing 18 5/8” casing drilling 17 ½” hole, running and cementing 13 3/8” casing, drilling 12 ¼” hole, running and cementing 9 5/8” casing, performing limit test, drill 8 ½” hole, running and cementing 7” casing liner, suspension of the well, curing total losses, deplete Shiranish formation gas, monitored the well and gas behaviour, run initial completions, retrieved tubing using chemical cutter, fished tubing with spear and over shot, cured losses and gains, cut and opened casing windows, squeezed LCM and cement, apply drilling to limit technology. Drill deep wells , run cemented completion , drill directional hole by motors and MWD, free stuck pipe differential stuck by reducing hydrostatic pressure , freeing stuck pipe due PDC bit jamming , apply free point indicator , cut 6 ½” dc by wire line explosives , perform cement plugs for abandonment and kick off point and curing losses .Ets
Workover : 4 Years experience
Experiences include, killing wells, running ESP pumps, running single selective completions, running dual selective completions, supervising TCP operations, milling and retrieving of packers, milling casing, cutting casing, running multy fingered calliper and conduct leak investigations, perform cement plugs for abandonment well ,acid stimulation and coiled tubing stimulation. Ets.
Agut. 2008 – Dec.2010
Employer Company: Weatherford IDS
Client Company: Sonatrach
Positions: consulted Senior Drilling supervisor
Work Locations: Hassi Messoud, Algeria
Work description:(A)
Drilling: 2 Years experience
Completing rig move, drilling 26 “top hole, running and cementing 18 5/8” casing , drilling 17 ½” hole, running and cementing 13 3/8” casing, drilling 12 ¼” hole, running and cementing 9 5/8” casing, performing limit test, drill 8 ½” hole, running and cementing 7” casing liner, suspension of the well, curing total losses, run initial completions, drill directional hole by motors and MWD, free stuck pipe& fishing operations, coring operation , drilling under balance
July. 2006 - 2016
Employer Company: ADCO /ADNOC
Client Company: ADCO
Positions: Sr.driling & work over supervisor
Work Locations: UAE
Work description:(A)
Workover : 6 Years experience
Experiences include, killing wells, running ESP pumps, running single selective completions, running dual selective completions, supervising TCP operations, milling and retrieving of packers, milling casing, cutting casing, running multy fingered calliper and conduct leak investigations, acid stimulation and coiled tubing stimulation. Ets .
Drilling: 4 years experience
Completing rig move, drilling 26 “top hole, running and cementing 18 5/8” casing , drilling 17 ½” hole, running and cementing 13 3/8” casing, drilling 12 ¼” hole, running and cementing 9 5/8” casing, performing limit test, drill 8 ½” hole, running and cementing 7” casing liner, suspension of the well, curing total losses, run initial completions, drill directional hole by motors& RSS and MWD, free stuck pipe& fishing operations, coring operation , drill pilot hole& perform production test, drilling under balance
My performance in ADCO:
Got two letters of appreciation as employee of month on 2012& 2010 from ADCO drilling leadership team .
- got letter of appreciation to make fast rig move in ADCO safely ,
- My rig was first rig in ADCO ON 2013.
- my rig was 7years without LTI.
- My performance was out stand .
- Solve most drilling problems in BB field like stuck pipe & well control issues& fishing operation.
- contribution & led to successful installation of the first smart completion in horizontal hole .in ADCO history BB 617.
-complete The Auto Gas Lift Pilot well for BB514
Mother language:
Arabic
Second language/level:
English (fluent in written & spoken)
Computer
Computer Literate in Microsoft word, Excel, Well plan. Compass. Land mark programs for well plan .. etc.